4.09.2009

Bathroom Floor

We finally got the bathroom ceiling and walls painted last weekend, so Adam was able to install the bathroom floor yesterday! We put down the peel-and-stick linoleum tiles, something that was easy enough for us to do ourselves and inexpensive.

This was Adam's first time installing any kind of flooring. He did a very good job. He even let me measure and cut a few of the edge pieces. It was actually fun - but I like numbers and math stuff.

The finished product! The plumber should be here this afternoon to install the toilet and sink! Then all we'll have left to do is hang up the little stuff like the mirror, towel bar, etc. Tomorrow I am going shopping for accessories - we're going with a pale blue and brown color scheme!
Sorry this is out of order - but I just had to put this picture up! Adam installing the last few tiles. Must have been hard work - the shirt is off :)

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...